On December 1, a batch of scraper winches in the second workshop of intelligent equipment production and manufacturing of China Coal Group was being loaded in full swing. After the technical engineers
On December 8th, a batch of small excavators in the second workshop of intelligent equipment production and manufacturing of China Coal Group are being loaded intensively. After the technical engineer
On December 6th, a batch of small excavators in the second workshop of intelligent equipment production and manufacturing of China Coal Group are being loaded intensively. After the technical engineer
On December 3, a batch of small excavators in the second workshop of intelligent equipment production and manufacturing of China Coal Group were being loaded. After the technical engineers verified th
On December 1, a batch of small excavators in the second workshop of intelligent equipment production and manufacturing of China Coal Group was being loaded in full swing. After the technical engineer
On November 30, sponsored by Jining Technical Education Group, and undertaken by Shandong China Coal Industry And Mining Group Co., Ltd., Jining Technical College, Jining Enterprise and Entrepreneur F
©China Mining&Construction Equipment Co., Ltd. © 2016
Address:No. 11, North of Kaiyuan Road, High-tech Zone, Jining City, Shandong Province, China
Executive Editor:Zhang Wen